Concrete is sold by the cubic yard, and a cubic yard is 27 cubic feet (3 × 3 × 3 ft). Every concrete estimate is the same three moves: find the volume of the form or hole in cubic feet, divide by 27, then add some for waste. The place people go wrong is mixing units, so convert the thickness to feet before you multiply. Four inches is 4 ÷ 12 = 0.333 ft; six inches is 0.5 ft. The concrete calculator does the conversion, the waste allowance and the bag count for slabs, footings and round piers.

Slabs, footings and round piers

A slab or footing is length × width × thickness, all in feet. A 10 × 12 ft patio at 4 in.: 10 × 12 × 0.333 = 40 ft³, which is 40 ÷ 27 = 1.48 yd³. A continuous footing is the same math with the trench width and depth: a 20 in. wide, 8 in. deep footing 60 ft long is 1.667 × 0.667 × 60 = 66.7 ft³, or 2.47 yd³.

A round pier is π × r² × depth, with the radius in feet. An 8 in. form tube has a 4 in. radius, 0.333 ft: 3.1416 × 0.333² × 4 ft deep = 1.4 ft³. A 12 in. tube 4 ft deep is 3.14 ft³. Add the bell or footing pad under the pier if the plans call for one. Measure the hole you dug, not the one on the drawing; an auger wanders and a hand-dug hole is never a clean cylinder.

Bags or a truck

Bagged concrete mix yields about 0.60 ft³ per 80 lb bag, about 0.45 ft³ per 60 lb bag and about 0.30 ft³ per 40 lb bag. Check the bag, because yields vary a little by product. That works out to roughly 45 bags of 80 lb mix per cubic yard, 60 of the 60 lb or 90 of the 40 lb. The 8 in. pier above takes 1.4 ÷ 0.60 = 2.3 bags, so buy three. The 10 × 12 patio takes 40 ÷ 0.60 = 67 bags before waste, over 5,000 lb of material to carry, mix and place before the first batch starts to set.

That is why the usual break point is about one cubic yard. Below it, bags win on convenience, and you can mix as you go for piers, post holes or a small landing. Above it, ready-mix is cheaper per yard, arrives at a consistent mix, and lets you place the whole slab in one go with no cold joints. Most bagged mix is rated 4,000 psi at 28 days if you keep the water close to the instructions, about 3 quarts per 80 lb bag. Soupy mix is weak mix.

Waste, minimum loads and ordering

Add 5 to 10% for waste: spillage, an uneven subgrade that eats an extra half inch across the slab, forms that bow, and what stays in the chute. Use the high end on a rough gravel base or hand-dug footings. Running short with the truck gone is far worse than an extra quarter yard, so round up. The 40 ft³ patio with 10% waste is 44 ft³, or 1.63 yd³, so you order 1.75 yards, or 2 if the plant sells in half yards.

Ready-mix plants have a minimum order, often 1 yd³, and most add a short-load fee for orders under about 3 or 4 yards; the fee and the threshold vary by supplier, so ask when you call. Have the pour ready before the truck arrives: forms braced, reinforcement in place, subgrade damp, a path for the chute or the wheelbarrows, and enough hands. The truck has to discharge within 90 minutes of batching (ASTM C94), and the driver's time on site is often metered after a short unloading window. Order the slump you want, typically 4 in. for a slab, and do not add water at the truck beyond what the ticket allows.

How thick and how strong

For residential flatwork, 4 in. is the common thickness for patios, sidewalks and shed slabs, and 5 to 6 in. is common for driveways and anywhere a vehicle parks; garage floors are usually 4 to 6 in. Thicken the edge where a slab carries a wall. Footings follow the 2021 IRC: Table R403.1(1) sets the minimum width by soil bearing capacity and the number of stories, the minimum thickness is 6 in., and R403.1.4 puts the bottom of the footing below the local frost line, which the building department will tell you.

Strength matters as much as thickness outdoors. 2021 IRC Table R402.2 calls for 3,500 psi air-entrained concrete for porches, carport slabs, steps and garage floors exposed to the weather in severe-weathering areas, which covers most of the northern states, and 2,500 psi for interior slabs and footings. Air entrainment is what keeps a slab from spalling through freeze-thaw cycles and road salt, and you have to ask for it on the order. The local authority having jurisdiction and its amendments govern.

Subgrade, reinforcement and curing

Concrete only performs as well as what is under it. Strip the topsoil, compact the subgrade, and lay a compacted gravel base, commonly 4 in., so the slab bears evenly and drains. The 2021 IRC (R506.2) requires a vapor retarder under slabs that will be inside heated space. Wet the base down before the pour so it does not pull water out of the mix. Welded wire mesh or #3 and #4 rebar on chairs, held in the middle of the slab rather than lying on the base, controls crack width; fiber in the mix is another option for flatwork. Cut or tool control joints about a quarter of the slab depth, spaced in feet at two to three times the thickness in inches, so a 4 in. slab gets joints every 8 to 12 ft.

Then cure it. Concrete gains strength by staying wet, not by drying out. Keep the slab damp or covered for seven days, keep foot traffic off for a day or two and vehicles off for at least a week, and never pour on frozen ground or let fresh concrete freeze. It reaches its rated strength at 28 days. BuildSmith runs the concrete, rebar and slab math on the job site without a signal, and the roofing squares and paint coverage calculators cover the next orders if the slab is going under a shed or garage.

Step by step

  1. Measure the form or holeLength, width and thickness for a slab or footing; diameter and depth for a pier. Measure what you actually dug, not the drawing.
  2. Convert to feet and find cubic feetLength x width x thickness in feet, or pi x radius squared x depth for a round pier. Four inches is 0.333 ft.
  3. Divide by 27 for cubic yardsA 10 x 12 ft slab at 4 in. is 40 cubic feet, which is 1.48 cubic yards.
  4. Add wasteAdd 5 to 10%, more on a rough subgrade, and round up. Running short mid-pour is worse than a quarter yard left over.
  5. Choose bags or ready-mixAn 80 lb bag yields about 0.60 cubic feet, so a yard is about 45 bags. Above about one cubic yard, call the plant and ask about minimum loads and short-load fees.
  6. Prepare the base before the truck comesCompacted subgrade, a gravel base, a vapor retarder where required, braced forms and reinforcement on chairs. Dampen the base before placing.
  7. Place, finish and cureDischarge within 90 minutes of batching, cut control joints, and keep the slab damp for seven days. Keep vehicles off for at least a week.

Frequently asked questions

How many 80 lb bags of concrete make a cubic yard?

About 45, since each 80 lb bag yields roughly 0.60 cubic feet and a yard is 27 cubic feet. A yard is about 60 bags of 60 lb mix or 90 bags of 40 lb mix.

How much concrete do I need for a 10 x 10 slab 4 inches thick?

10 x 10 x 0.333 = 33.3 cubic feet, or 1.23 cubic yards. With 10% waste that is about 1.36 yards, so order 1.5 yards, or buy about 61 bags of 80 lb mix.

How thick should a concrete driveway be?

Commonly 5 to 6 inches where vehicles park or drive, on a compacted base. In severe-weathering areas the 2021 IRC calls for 3,500 psi air-entrained concrete for exposed flatwork such as garage floors, porches and steps.

When is ready-mix cheaper than bags?

Usually above about one cubic yard. Bags are convenient for piers and small pours; a truck delivers a consistent mix and lets you place a slab without cold joints, though short loads under 3 or 4 yards often carry a fee.

Written by TapForge Studios, a one-person Android studio run by a tradesman with a background in electrical, HVAC and life-safety work. Reviewed October 7, 2026. This guide is general information, not engineering, legal or tax advice; the adopted code edition, the manufacturer's instructions and the authority having jurisdiction govern.

Free, no ads, made by one person. If this guide helped, you can support the site.

Take this to the job site

The same tools, and more, in apps that work offline when there is no signal.

BuildSmith: Construction Calc

BuildSmith: Construction Calc

NICET/Tools

37 trade calculators, code tables and converters for the whole job site, fast and offline.

GableForge: Home Inspection

GableForge: Home Inspection

Utilities/Misc.

Write home inspection reports offline: rate items, add photos and send a PDF from the site.

Calculators used in this guide

Video walkthroughs on YouTube. The TapForge channel posts walkthroughs like this one and app demos. Subscribe to the channel.

More how-to guides

All how-to guides

Get the next tool first.

One short email when a new calculator, guide, practice exam or app goes live. No spam, unsubscribe any time.

You'll get a confirmation email first. We never share addresses.